8-Jan-2019Lake Jackson, TX+14 milesClassifieds
Lots of fun for little ones. 76 lost a few All for 5$ Box not included Porch pick up
I have a lot of different building blocks here. Three drawers completely full. Plastic drawers are not included. I didn t count but there has to be at least 150 pieces here if not more. Includes wooden blocks, plastic blocks and some smaller LEGO like blocks. Asking $25 FOR ALL!
It's on the curb and needs repair. I don't live there so I don't know anything else about it.
$8

Blocks

24-Dec-2018Lake Jackson, TX+14 milesClassifieds
Has been opened but never played with. Good condition
Similar
14-Jan-2019Angleton, TX+15 milesMotorcycles for Sale
2019 Can-Am Maverick Sport DPS 1000R, 2019 Can-Am Maverick Sport DPS 1000 LIMIT LESS The feelings you ll crave over and over: whatever the terrain, the up to 100 horsepower Maverick Sport brings Can-Am thrills to a 60-inch package. With a year of maintenance-free running ahead of you, it s time to ride with the mavericks. Features may include: SIGNATURE STANCE It's the Can-Am you expect: engine...
14-Jan-2019Lake Jackson, TX+14 milesClassifieds
Minnie mouse table n chairs, pickup in LJ. 12$ if u message and don't respond, or say pick up this day and don't come. I will block u. $12firm
$950

Bow

Bowtech rpm360 fully rigged, has lightning Camo and blue accents. Rarely used, comes with 6 carbon express maxima red arrows, 5 broadheads, 3 field tips, trufire release, a hard case and a block target.
Neutral, textured brand new panels block out over 98% of light. Never been opened. Bought two and only ended up needing one set. Very nice. You need a decorative rod just above the window to hang them on.
$2,000

Generator

4-480 lugs,camper plug,heavy equipment jumper,1-120 plug outlet,2-220 plug outlet,2cylender deisel,7gallon fuel tank will run a city block.979 2158232 or 9794184991
7-Jan-2019Brazoria, TX+5 milesClassifieds
12 Alpine Type S dual voice coil 4-Ohm and 500watt class D mono block amp. Like new condition only used them for about 3 months
$10

Toy

Item posted in the Building Sets & Blocks category
Looking for styrofoam block to put back in boat seats for floatation purposes. Chickens ate all of styrofoam.
1 + ... Next >